Customer Needs
Yanshan series compensation station is equipped by another supplier in 2009, aiming to improve the transmission capacity, stability and reliability of Wenshan-Daxin 500kV line, reduce the loss and optimize the power grid.
Due to changes in line parameters, Yanshan series compensation station is upgraded from 2x435Mvar (rated current 2700A) to 2x 355Mvar (rated current 3150A) in 2015.
The main replacement equipment includes: MOVs, damping reactors, control and protection systems.
Other work includes: adjusting the capacitor bank, increasing the number of parallels and reducing the number of series; adjusting the spark gap distance and test; rewiring and completing commissioning tests.
RXPE Solution
Rongxin power supplies 2 x 500kV series compensation devices for the Yanshan project.
Boshang SC protection scheme is designed as MOV plus spark gap and bypass circuit breaker. Assuming if an external line fault occurred, the fault current should be bypassed by the MOVs, neither the spark gaps nor circuit breakers are allowed to act; only if internal line faults occurred that the spark gaps and circuit breakers bypass is allowed. This means SC will be always online only except for internal lines faults, giving a high availability.
Yanshan series compensation station is equipped with MOVs with polymer housings and damping reactors + damping MOVs + damping resistor type damping circuit.
The single line diagram is shown as below:
Customer Benefits
With commissioning completed in 2016, Yanshan series compensation station operates stably and reliably so far.
The upgrading of Yanshan series compensation station improves the transmission capacity, overcomes the transmission bottlenecks and significantly enhances the system stability.
RSVG for load compensation of electric arc furnace--Substation of Fujian Hua'an hydropower plant. The 10kV busbar of Fujian Hua'an hydropower plant power development company 35kV Jinshan No.2 substation is connected with four feeders of Yuxing I, II, III and IV for the load of HUAYIXIN iron plant. Yuxing I and II feed two 8000kVA electric arc furnaces respectively, YuxingIII supply one 4000kVA refining furnace, Yuxing IV supply one 630kVA power transformer and 5000kVA reactive power compensation device. In normal production, two EAF and refining furnace will be produced at the same time.
With the rapid development of electrified railway, its influence on power supply and consumption system side is increasingly prominent. Because the railway is a 27.5kV single-phase load, if the balance compensation is not carried out, the voltage of the public access point will be seriously unbalanced, which will have a serious impact on other loads of the network point.